Milton Keynes Driveways & Landscaping 01908 104408 Free design
Dropped kerb on a larger detached house, typical of Aspley Guise

Dropped kerbs in Aspley Guise

How dropped kerbs work in Aspley Guise, what Central Bedfordshire Council charges and requires, and how we build the driveway to meet it.

In Aspley Guise, dropped kerbs are installed by Central Bedfordshire Council itself, not by private contractors. You pay a £156 non-refundable fee for a site assessment, the council quotes for the work, and it builds the crossing once paid; we build the driveway behind it and line the two up.

Highway authority
Central Bedfordshire Council
Council fees
£156 non-refundable assessment fee, then the council’s own quotation
Who builds it
Central Bedfordshire Council installs the dropped kerb itself
Timescale
Change-of-use check can take up to 8 weeks

Council fees checked October 2026. See Central Bedfordshire Council’s own guidance.

How it works in Aspley Guise

Getting a dropped kerb approved in Aspley Guise

  1. Step 1You apply to Central Bedfordshire Council and pay the £156 non-refundable assessment fee, which includes a site inspection.
  2. Step 2If the crossing is acceptable, the council sends a written quotation for the work.
  3. Step 3Full payment to the council is needed before work starts; the council’s own team forms the crossing.
  4. Step 4We build the driveway and hardstanding behind it, programmed so the levels meet the new crossing.
The rules

What Central Bedfordshire Council looks for

  • The access has to be onto a public highway — a private road cannot be progressed.
  • Your hardstanding must let the whole vehicle park without overhanging the pavement.
  • On an A, B or C road you need planning permission first, and a change-of-use check can take up to 8 weeks.
  • If the access crosses land that is not public highway, a deed of easement may be needed — in the region of £2,000 where the council owns the land.
Aspley Guise specifically

Ground, drainage and conservation in Aspley Guise

Most Aspley Guise homes we see have walled and hedged plots, which usually leaves room for a parking area at least 5m deep and 2.5m wide that Central Bedfordshire Council asks for. We measure it at the visit, before you pay any council fee.

The village sits on the Woburn Sands sandstone, worked for fuller’s earth here since at least the 16th century. The sand drains freely, but the village slopes towards the Ouse valley, so run-off coming down from above needs handling.

The Aspley Guise Conservation Area appraisal (2008) recommends clay brick paviors or York stone, lime mortar, and keeping ironstone and brick boundary walls and hedges. There is no Article 4 direction here, though neighbouring Husborne Crawley has one covering hardstanding, walls and dropped kerbs.

Surface water is the documented risk: in June 2016, 16 properties were affected on Bedford Road, The Square and West Hill, according to Central Bedfordshire Council’s flood investigation. You can check any address on the Environment Agency flood map.

Sources: Aspley Guise Conservation Area appraisal · Central Bedfordshire flood investigation, June 2016.

Where we come in

What we do

We do not build the crossing itself here — the council does. We design and build the driveway so it is the right size for the council’s rules, help you with what the application needs, and time our work around the council’s so the two meet at the right level.

  • A measured drawing of the access and front garden
  • Advice on width, visibility and space before you pay any fee
  • The driveway or hardstanding behind the crossing
  • Levels tied into the crossing, not left as a step
  • Drainage so water stays off the footway
  • A five year guarantee on our work, in writing
Questions

Dropped kerbs in Aspley Guise: questions

How much does a dropped kerb cost in Aspley Guise?
The council’s own fees in Aspley Guise are £156 non-refundable assessment fee, then the council’s own quotation. The works themselves depend on the length, the kerbs and any services or street furniture in the way; in Central Bedfordshire the council quotes and builds it.
Who can build a dropped kerb in Aspley Guise?
Central Bedfordshire Council installs the dropped kerb itself. We do not build the crossing itself here — the council does. We design and build the driveway so it is the right size for the council’s rules, help you with what the application needs, and time our work around the council’s so the two meet at the right level.
How long does a dropped kerb take in Aspley Guise?
Change-of-use check can take up to 8 weeks. The crossing itself is usually a day or two on site; the approval is the long part, so start it early.
Do I need planning permission for a dropped kerb in Aspley Guise?
If your house is on an A, B or C road, yes — planning permission comes before the highway application. Parts of Aspley Guise are in a conservation area, where changes to front boundaries need more care.
What rules does my driveway have to meet in Aspley Guise?
The access has to be onto a public highway — a private road cannot be progressed. Your hardstanding must let the whole vehicle park without overhanging the pavement. On an A, B or C road you need planning permission first, and a change-of-use check can take up to 8 weeks.
Do you cover Aspley Guise?
Yes. We work across Aspley Guise (MK17) and nearby areas including Aspley Heath, Woburn Sands, Husborne Crawley, Ridgmont, Salford, Hulcote. The visit is free.

Planning a dropped kerb in Aspley Guise?

We will look at the frontage, check it against Central Bedfordshire Council’s rules before you pay any fee, and price the driveway and crossing in one written proposal.

Call 01908 104408 Free design