Milton Keynes Driveways & Landscaping 01908 104408 Free design
Tarmac driveway on a new-build red-brick home

Tarmac driveways

Quick, cost-effective and genuinely the right answer for a long approach, a shared drive or a large parking area. Just not the answer to everything.

Tarmac is the most cost-effective surface for large areas, long approaches and shared drives, and it gets cheaper per square metre as the area grows. A new tarmac drive on a rebuilt base typically costs £90–£130 per square metre in Milton Keynes; where the base is sound, a plane and re-top costs far less.

Typical cost
£90–£130 per m² — cost guide
Typical time
3–5 working days
Surfacing
Usually a single day
Guarantee
5 years, in writing
Where tarmac wins

Area, and the price of area

Tarmac gets cheaper per square metre as the area grows, which is the opposite of most surfaces. On a long farm approach, a shared drive serving several houses or a big parking area, nothing else comes close on cost.

It also goes down fast. A drive that would take a week in block paving can be surfaced in a day once the base is ready, which matters if the drive is the only way in and out.

What it will not do is look special. Tarmac is a workmanlike surface. Where it wants to look better, a block or sett border and a proper entrance detail transform it for very little money.

What you get

Everything below is included in a tarmac driveway

Quick to lay, kind on the budget and the sensible answer for a long approach or a shared drive. A block or sett border lifts it enormously.

  • A free design so you can see it before you commit
  • A home visit with real samples, at a time that suits you
  • Your old surface taken up and taken away
  • Breaking out the old surface and base, priced in from the survey
  • One price, agreed up front, with nothing added afterwards
  • A tidy site every evening and no skip left on your road
  • A five year guarantee, in writing, that transfers if you sell

Small tarmac jobs attract a delivery surcharge because a minimum load has to come out whether you need it or not. On drives under about 40 square metres we will often price block paving alongside it, because it can genuinely work out cheaper.

Two different jobs

Resurfacing or rebuilding

There are two tarmac jobs and they cost very different amounts. Knowing which one you actually need is the first thing we work out on site.

Plane and re-top. Where the base is sound and only the surface has gone, we plane off the top layer, sort out any weak areas and lay a new wearing course. Fast, tidy, and it keeps your levels at the thresholds.

Full reconstruction. Where the base has failed — potholes that keep coming back, edges crumbling, ruts where the cars sit — there is no point surfacing over it. It comes out and gets rebuilt from formation.

  • Insurance and damage claims handled with proper written specifications and photographs
  • Shared drives quoted so each household can see their share
  • Sett or block borders and entrance detailing available
  • Existing gullies, channels and manholes reset to the new levels
Tarmac driveway edged with granite setts
Ideas

The kind of finish we build

Tarmac driveway on a limestone cottageTarmac driveway on a larger detached houseTarmac driveway on a 1970s–80s Milton Keynes estate houseTarmac driveway on a Victorian terraced house
By council

Planning and dropped kerbs by council

A front driveway needs no planning permission if it is permeable or drains to your own lawn or border; more than 5m² of impermeable surface draining to the road does (Planning Portal guidance). A new or wider entrance also needs a dropped kerb, and who builds it depends on your council.

CouncilTowns we coverDropped kerb feesWho builds the crossing
Milton Keynes City CouncilMilton Keynes, Bletchley, Wolverton, Stony Stratford, Newport Pagnell, Olney, Woburn Sands, Bow Brickhill, Hanslope£237 to apply, plus a £537 licence packagean NRSWA-qualified contractor under council licence (we can do it)
Central Bedfordshire CouncilAspley Guise, Cranfield, Woburn, Leighton Buzzard, Ampthill£156 assessment fee, then the council’s quotethe council itself
Buckinghamshire CouncilWinslow£520.38 licencea private NRSWA-qualified contractor you appoint
West Northamptonshire CouncilTowcester£330 licence and inspection feea contractor from the council’s approved list

Fees from each council’s website, checked October 2026. See dropped kerbs for the full process in each town.

Questions

Things people ask us

How soon can I drive on new tarmac?
Usually the same evening for cars, though it stays soft for a few days in warm weather. Avoid turning the wheels while stationary and keep trailer jockey wheels and motorbike stands off it for a fortnight.
Why does my tarmac drive keep getting potholes?
Almost always because the base is too thin or water is getting into it. Filling the holes treats the symptom. We will dig a trial hole and tell you which job you actually need.
Can tarmac be laid over block paving?
It can be done but we would generally advise against it. The blocks move independently and the joints eventually reflect through.
Is tarmac permeable?
Standard tarmac is not, so the water has to be dealt with — usually a channel drain to a soakaway. Porous asphalt exists and we can specify it where it is the right answer.
How long does a tarmac driveway last?
A tarmac driveway on a properly built base typically lasts 15 to 20 years or more before it needs resurfacing. The surface slowly loses its binder and greys with age, but what shortens its life is water getting into a thin or poorly compacted base. Solid edges, falls that shed water and sealing any cracks early keep it going far longer than a drive that is simply left.
Why do tarmac driveways crack?
Tarmac driveways crack mostly because the base moves or water gets underneath and freezes. A thin sub-base, unrestrained edges that let the surface spread, tree roots and tarmac laid over cracked concrete are the usual culprits. Shrink-swell movement in the clay common across Milton Keynes adds to it where the base is shallow. Hairline cracks can be sealed; cracks that keep widening mean the base needs rebuilding, not patching.
Can new tarmac be laid over an old tarmac or concrete drive?
New tarmac can go over an old tarmac drive if the base is sound, but planing off the worn top first is usually better because it keeps the finished level below your door thresholds and damp course. Overlaying concrete is riskier: the joints and cracks in the slab tend to reflect up through the new surface within a few years. We dig a trial hole to see what is underneath before recommending either.
Does oil or petrol damage a tarmac driveway?
Yes, oil, diesel and petrol soften tarmac because they dissolve the bitumen that binds it, leaving a soft, crumbly patch if spills are left. Soak up leaks straight away with an absorbent such as cat litter, then wash the spot with water and a little detergent. A car that drips regularly should sit on a drip tray, and a bitumen-compatible sealer can be applied to an older drive for extra protection.
How thick should a tarmac driveway be?
A domestic tarmac driveway is commonly built as a binder course of around 50–60mm with a 25–30mm surface course on top, laid over at least 150mm of compacted MOT Type 1. Our drives are finished in stone mastic asphalt, a dense, hard-wearing surface course, and the exact thicknesses are written into the proposal. Thin single-layer tarmac on a shallow base is what produces potholes within a few winters.
What is the best time of year to lay a tarmac driveway?
Tarmac is best laid from spring to early autumn, when it stays hot long enough to be rolled to full compaction. It can be laid through much of the winter on dry days, but cold air and wet ground shorten the working time, and frost or standing water stop the job. Hot summer days bring the opposite issue: the new surface stays soft longer, so take care turning on it for the first few weeks.
Is tarmac or block paving better for a driveway?
Tarmac is better for large areas, long approaches and shared drives, where it is quicker and cheaper per square metre. Block paving is better where looks, colour choice and repairability matter, because individual blocks can be lifted and relaid with no visible patch. On small drives under about 40m² block paving can cost the same or less, so it is worth pricing both. A block or sett border gives tarmac a much more finished look.

Free design, free visit, free samples

We measure up, talk it through and send a written proposal with the build-up, the programme and one whole price. No pressure and no follow-up sales calls.

Call 01908 104408 Free design