Milton Keynes Driveways & Landscaping 01908 104408 Free design
Single storey extension on a 1970s–80s Milton Keynes estate house

Extensions

Single storey rear and side extensions. We are strongest below ground and at the interfaces — which is where extensions actually go wrong.

A single storey extension typically costs £2,400–£3,200 per m² finished ready for decoration — roughly £29,000–£38,500 for a 12m² rear extension, with any kitchen fit-out priced separately. We build single storey rear and side extensions, not two storey or loft work. Many fall within permitted development; building regulations always apply, and building within 3m of a public sewer needs a build-over agreement. A modest rear extension to watertight shell is typically eight to twelve weeks.

Typical cost
£2,400–£3,200 per m²
Typical time
8–12 weeks to watertight
Building regs
Always
Drains
Build-over agreements handled
What we take on

Single storey, done thoroughly

We build single storey rear and side extensions and garden rooms. We do not do two storey work or loft conversions, and we would rather tell you that now than take on a job we would not run well.

Within that, we are comfortable with the parts that cause most of the trouble: foundations near trees or drains, building over or close to a public sewer, existing drainage that has to be diverted or rebuilt, and the junction between old and new at the roof and the threshold.

Those are groundworks and detailing problems, which is what we have always done.

Below ground

Foundations and drainage

The excavation is where an extension budget is won or lost. Trees, made ground, an old outbuilding base, a drain running exactly where the footing needs to go — all of it turns up after the digger arrives unless somebody looks first.

We dig trial holes before we price where there is any doubt, survey the existing drainage rather than assuming the plan is right, and put a realistic foundation depth in the quote rather than a hopeful one.

Above ground, the design starts from measured drawings. Where a house is older, has been extended before or simply isn't square, our sister survey company Dimensure can laser scan it first, so the new walls, floor levels and roof meet the existing house exactly.

  • Trial holes before pricing where foundations are uncertain
  • Existing drainage surveyed, chambers lifted and levels taken
  • Build-over agreements handled where a sewer is involved
  • Tree proximity assessed and foundation depth designed for it
  • Ground floor to current U-values with insulation carried up at the perimeter
Single storey extension on a new-build red-brick home
Scope

Where you want us to stop

Shell and watertight

Foundations, drainage, structure, roof, windows and doors. You take it on from there with your own trades.

Shell plus first fix

As above, plus electrics and plumbing first fix, insulation and plasterboard, ready for a fit-out.

Full turnkey

Everything through to decoration and floor finishes, with one programme and one point of contact.

By council

Building control and planning advice by council

Householder planning permission costs £548 from April 2026, or £274 for a lawful development certificate if your extension is permitted development (Planning Portal: extensions). Building control charges and pre-application advice vary by council.

CouncilTowns we coverBuilding controlPre-application advice
Milton Keynes City CouncilMilton Keynes, Bletchley, Wolverton, Stony Stratford, Newport Pagnell, Olney, Woburn Sands, Bow Brickhill, HanslopeMilton Keynes City Council’s 2026 scheme of charges lists a 10–40m² extension at £700 plus VAT (£840) on full plans, or £769 plus VAT as a building notice; up to 10m² is £555 plus VAT£360 for a householder project (£180 for outbuildings), with a written reply within six weeks
Central Bedfordshire CouncilAspley Guise, Cranfield, Woburn, Leighton Buzzard, AmpthillCentral Bedfordshire Council publishes its building control charges as a schedule (plan charge on submission, inspection charge after the first visit); ask its Building Control team for the current figure for your size of extension£150 for written advice, or £300 with a meeting (both including VAT), with a reply within four weeks
Buckinghamshire CouncilWinslowBuckinghamshire Council does not publish fixed building control fees; it quotes for each project, so you request a building control quote for the extension£579.40 including VAT, for an initial meeting and a written reply
West Northamptonshire CouncilTowcesterWest Northamptonshire Council’s 2026 fee schedule lists a 10–40m² extension at £720 as a building notice, or £191.75 plan charge plus £528.50 inspection on full plans (including VAT); up to 10m² is £564.75 as a building notice£135 for written advice, or £267 with a site visit

Checked October 2026. Planning fees are the national fees from 1 April 2026.

Questions

Things people ask us

Do I need planning permission for an extension?
Many single storey rear extensions fall within permitted development, but the limits depend on the property type, how much has been built before and whether you are in a conservation area. Confirming it is your responsibility and we will point you at the right check.
Can I build an extension over or near a public sewer?
If you are building over or within 3m of a public sewer you will need a build-over agreement from the water authority. We handle the application and the survey work that goes with it.
Do I need a party wall agreement for a single storey extension?
If you are excavating within 3m of a neighbour's structure and deeper than their foundations, or building on the line of junction, yes. We will flag it early because the notice periods can affect your start date.
How long does a single storey extension take to build?
A modest single storey rear extension to watertight shell is typically eight to twelve weeks; a full fit-out longer. Building control attendance and material lead times are usually what moves it.
How far can I extend my house without planning permission?
Under permitted development a single storey rear extension can go 3m beyond the original back wall of a semi-detached or terraced house, or 4m on a detached house, without planning permission. It can be up to 4m high, with eaves no higher than 3m if it is within 2m of a boundary. With prior approval those depths rise to 6m and 8m. Conservation areas, listed homes and estate conditions change this.
What is prior approval for a larger rear extension?
Prior approval is a short council process that lets a single storey rear extension go up to 6m deep on a semi or terrace, or 8m on a detached house, without a full planning application. You submit plans, the council consults your neighbours, and it has 42 days to decide. Work must not start until approval is given or the 42 days pass without a decision. It is not available in conservation areas.
Can I build a single storey side extension without planning permission?
Yes, a single storey side extension can be permitted development if it is no more than 4m high and no wider than half the width of the original house. It must use materials similar to the existing house and must not face a road. In a conservation area, including parts of Olney, Wolverton and Towcester, side extensions always need planning permission.
Does a single storey extension need building regulations approval?
Yes, every single storey extension needs building regulations approval, whether or not it needs planning permission. The inspector visits at set stages: foundations, drainage, damp-proofing, insulation before it is covered, and the final inspection. We produce the drawings, make the application, attend each visit and hand you the completion certificate. In Milton Keynes the fee for a 10–40m² extension is £700 plus VAT on full plans.
How much does a single storey extension cost per square metre?
A single storey extension typically costs £2,400–£3,200 per m² finished ready for decoration, which puts a 12m² rear extension at roughly £29,000–£38,500. A kitchen fit-out is priced separately. The figure moves with foundation depth, drainage diversions, the roof type, rooflights and bifold doors, and how much of the existing back wall comes out. You get one fixed price in writing after the survey.
What costs sit outside the build price of an extension?
The main costs outside the build price are council fees, specialist consultants and the fit-out. Expect the building control fee, a £548 householder planning fee or £274 lawful development certificate where needed, a structural engineer for any steel, a party wall surveyor if a neighbour dissents, and a build-over agreement if a sewer is involved. A kitchen fit-out is priced separately.
Do I need a structural engineer for a single storey extension?
Usually yes, if the extension opens up the existing back wall, because the steel beam that carries the house above needs calculations for building control. An engineer is also needed for unusual foundations, such as piles near large trees or on deep made ground. We produce the drawings in-house and tell you at the visit whether calculations are needed, so they are in the programme rather than a surprise.
Can I stay in my house while a single storey extension is built?
Yes, most people stay at home while a single storey extension is built. The new shell is put up and made watertight before the existing back wall is opened up, so the noisy, dusty break-through is kept short and sealed off. If the kitchen is affected you may need a temporary kitchen for a few weeks, and that is planned into the programme.

Free design, free visit, free samples

We measure up, talk it through and send a written proposal with the build-up, the programme and one whole price. No pressure and no follow-up sales calls.

Call 01908 104408 Free design