Dropped kerbs in Olney
How dropped kerbs work in Olney, what Milton Keynes City Council charges and requires, and how we build the driveway to meet it.
In Olney, a dropped kerb needs permission from Milton Keynes City Council before any work touches the footway. You apply as the homeowner (£237), then your contractor — who must hold an NRSWA street works qualification and public liability insurance — takes out a Private Opening Licence (£537) and builds it under council inspection.
- Highway authority
- Milton Keynes City Council
- Council fees
- £237 residential application, plus £537 for the contractor’s Private Opening Licence
- Who builds it
- Your own contractor with an NRSWA street works qualification and public liability insurance
- Timescale
- Licence valid for 6 months; 24-month maintenance period after
Council fees checked October 2026. See Milton Keynes City Council’s own guidance.
Getting a dropped kerb approved in Olney
- Step 1You apply to Milton Keynes City Council and pay the £237 residential fee. The council visits and assesses the site.
- Step 2Once approved, your contractor applies for a Private Opening Licence (£537), which covers up to five inspections and the completion certificate.
- Step 3The crossing is built to the council’s specification within six months of the licence and inspected as it goes.
- Step 4Your contractor carries a 24-month maintenance period on the crossing; any defects found at inspection are put right at their cost.
What Milton Keynes City Council looks for
- Nothing can be done on the footway or verge before permission — working on the highway without it is an offence under the Highways Act 1980.
- The council looks at visibility, the verge, street lights, trees and services on its site visit.
- The fee is non-refundable, so it is worth checking the basics with us before you apply.
Ground, drainage and conservation in Olney
Most Olney homes we see have cottage frontages and estate drives, which usually leaves room for a hardstanding of at least 5.0m by 2.5m that Milton Keynes City Council asks for. We measure it at the visit, before you pay any council fee.
Olney sits on Great Oolite limestone, which generally drains better than Milton Keynes clay — but clay bands and the Ouse flood plain change that locally, so we do a percolation test before designing a soakaway.
Olney’s conservation area has an Article 4 direction for houses that removes permitted development for extensions, alterations, porches and painting outside walls. Front hard surfaces, outbuildings and boundary walls are not covered, so a permeable drive is still permitted development.
The Great Ouse valley runs along the south of the town, and Milton Keynes City Council’s flood risk assessment notes a cluster of sewer flooding records in Olney. You can check any address on the Environment Agency flood map.
Sources: Milton Keynes Article 4 directions (Olney) · Olney Conservation Area map.
What we do
We can build the crossing ourselves here: we hold the NRSWA street works qualification the council asks for. We give you what you need for the application, take out the Private Opening Licence, and build the crossing and the drive behind it as one job.
- A measured drawing of the access and front garden
- Advice on width, visibility and space before you pay any fee
- The driveway or hardstanding behind the crossing
- Levels tied into the crossing, not left as a step
- Drainage so water stays off the footway
- A five year guarantee on our work, in writing
Dropped kerbs in Olney: questions
How much does a dropped kerb cost in Olney?
Who can build a dropped kerb in Olney?
How long does a dropped kerb take in Olney?
Do I need planning permission for a dropped kerb in Olney?
What rules does my driveway have to meet in Olney?
Do you cover Olney?
The driveway behind it
Planning a dropped kerb in Olney?
We will look at the frontage, check it against Milton Keynes City Council’s rules before you pay any fee, and price the driveway and crossing in one written proposal.