Milton Keynes Driveways & Landscaping 01908 104408 Free design
Sandstone patio on a larger detached house

Patios and terraces

Porcelain, sandstone, limestone and travertine, laid on a full bed with every visible edge mitred. No cut tile edges anywhere on the job.

We lay porcelain, sandstone, limestone and travertine patios on a full mortar bed with a bonding primer where the slab needs it, falls away from the house and levels kept below the damp proof course. Porcelain patios in Milton Keynes typically cost £150–£200 per square metre laid.

Typical cost
£150–£200 per m² — cost guide
Typical time
3–7 working days
Guarantee
5 years, in writing

Free design

We will design your driveway or garden and show you what it will look like, before you have spent a penny or committed to anything.

Samples at your door

We bring the actual blocks, slabs and aggregates to the house so you can see them against your brick, in your light, in the rain.

One price, held

The figure we give you is the figure you pay. No day-rate creep, no extras invented halfway through, nothing added at the end.

Getting it right

The two things that actually matter

Most patio failures come down to one thing: the slab was not fully bedded. Spot bedding and five-dot bedding leave voids under the slab. Water gets in, freezes, and the slab cracks or rocks. It is faster to lay and it is the reason so many patios are lifting after three winters. We bed full, every time, with the back of the slab slurry-primed first.

The second is the edge. A patio with sawn tile edges on show around the perimeter and the steps always looks like a tiling job. Mitring every exposed edge so the face material wraps the corner takes longer and costs more, and it is the difference between a patio and a terrace.

Neither of these is an upgrade on our quotes. They are what we do.

What you get

Everything below is included in a new patio or terrace

A proper outdoor room rather than a slab of paving. We design the shape, the levels and the lighting around how you will actually use it.

  • A free design so you can see it before you commit
  • A home visit with real samples, at a time that suits you
  • Your old surface taken up and taken away
  • Breaking out the old surface and base, priced in from the survey
  • One price, agreed up front, with nothing added afterwards
  • A tidy site every evening and no skip left on your road
  • A five year guarantee, in writing, that transfers if you sell
Detail

The things that finish a patio

A patio is mostly a big flat area, so the quality lives entirely in the edges and the junctions. That is where we spend the time.

  • Every exposed edge mitred, including step nosings
  • Falls set at 1:80 away from the house and checked as we lay
  • Joints brush-filled, struck and washed down properly
  • Slabs mixed from several packs so shade banding does not show
  • Full-size slabs at the eye lines, cuts kept out of sight
  • Levels set so the patio sits safely below your door threshold
Porcelain patio on a new-build red-brick home
Ideas

The kind of finish we build

Porcelain patio on a 1970s–80s Milton Keynes estate housePorcelain patio on a Victorian terraced housePorcelain patio on a Georgian brick and stone housePorcelain patio on a limestone cottage
Questions

Things people ask us

Should I choose a porcelain or natural stone patio?
Porcelain if you want low maintenance, consistent colour and no sealing. Natural stone if you want character and do not mind that it will weather and change. Both cost broadly similar once laid, because the labour is where most of the money goes.
Does a porcelain patio get slippery when wet?
External porcelain is manufactured with a textured face and rated for wet slip resistance. It is generally no more slippery than wet stone, and less than smooth sawn stone or decking.
Can a new patio be laid over an existing patio?
Sometimes. If the old patio is solid, well drained and low enough for the new levels to work at the door threshold, it can serve as the base. We will check it rather than assume.
What are the white marks that appear on a new patio?
Efflorescence — salts drawn out of the bedding in the first winter. It washes off and it is not a fault. Porcelain shows it less than stone.
Does a new patio need sealing?
Porcelain, no. Sandstone and limestone, usually yes, and we will tell you which sealer and when.
How far below the damp proof course should a patio be?
At least 150mm below the damp proof course, which is the standard set out in building regulations guidance so that rain splashing off the paving cannot bridge the DPC and bring damp into the walls. Where a door threshold or existing levels make 150mm impossible, the usual answer is a drainage channel or gravel strip along the wall. We check the DPC level before the design is drawn.
What fall does a patio need?
A patio needs a gentle fall away from the house so rainwater runs off rather than sitting on the surface or running towards the walls. We lay ours at 1:80, about 12mm of drop for every metre, and check it as each slab goes down. On the slow-draining clay common around Milton Keynes, the water also needs somewhere to go at the low edge, such as a border, a channel drain or a soakaway.
What base does a patio need?
A patio needs a compacted sub-base under the bedding, not slabs laid straight onto soil or sand. We dig out, compact the formation, lay a minimum of 100mm of MOT Type 1 and compact it, then lay every slab on a full mortar bed, with a bonding primer on the back where the slab needs it. On soft clay or made ground the sub-base may need to be deeper.
How long does it take to build a patio?
Most patios take three to seven working days, depending on the size, the levels and how much old paving has to come out first. Steps, retaining walls and raised beds add time, as does access that means everything goes through a side gate by barrow. Your written proposal sets out the programme before we start, and you can usually walk on the patio a day or two after the last slabs are pointed.
Do I need planning permission for a patio?
Usually not for a patio in a back garden laid at or close to ground level. A raised patio or platform more than 30cm above the ground needs planning permission, and so can paving at a listed building or in some conservation areas. In a front garden, more than 5m² of impermeable paving that drains towards the road needs permission unless the water is directed to a lawn, border or soakaway.
How long does a patio last?
A well built patio should last 25 years or more, and porcelain and good natural stone will outlive the mortar joints. What shortens a patio's life is almost always what is underneath: slabs spot-bedded on dots of mortar, a thin base or poor falls let water in, and frost does the rest within a few winters. Pointing may need attention over time; the slabs themselves should not.
How much does a new patio cost in Milton Keynes?
Porcelain patios in Milton Keynes typically cost £150–£200 per m² laid and sandstone £130–£180 per m², so a typical 25–30m² porcelain patio comes to around £4,000–£6,000. Steps, retaining walls, lighting and removing an old patio change the total. You get one fixed written price after the free design visit, and it does not move once agreed.

Free design, free visit, free samples

We measure up, talk it through and send a written proposal with the build-up, the programme and one whole price. No pressure and no follow-up sales calls.

Call 01908 104408 Free design