
What a tarmac driveway costs
Honest guide prices for tarmac driveways in Milton Keynes — a full rebuild, a plane and re-top, and when tarmac is not the cheapest answer.
A new tarmac driveway in Milton Keynes typically costs £90–£130 per m² on a properly rebuilt base, so a two-car front drive of 40–50m² is usually £4,500–£6,500. Where the base is sound, a plane and re-top costs £45–£70 per m².
- Full rebuild per m²
- £90–£130
- Two-car drive (40–50m²)
- £4,500–£6,500
- Plane and re-top
- £45–£70 per m²
- Sett or block border
- +£40–£70 per linear metre
Updated October 2026. Guide prices, not a quote — your fixed price comes in writing after the free visit.
Tarmac driveway prices in 2026
| What | Typical price |
|---|---|
| New tarmac drive, full rebuild, per m² | £90 – £130 |
| Typical two-car front drive (40–50m²) | £4,500 – £6,500 |
| Plane and re-top on a sound base, per m² | £45 – £70 |
| Block or sett border | add £40 – £70 per linear metre |
Updated October 2026. Guide prices for 2026 across Milton Keynes and the surrounding towns. They are honest ranges, not a quote — your fixed price comes in writing after the free visit, and it does not move once agreed.
What changes the figure
- Rebuild or resurface. The biggest single factor. A failed base has to come out and be rebuilt; a sound one can take a new surface.
- Size. Tarmac gets cheaper per square metre as the area grows, because the crew and the minimum load cost the same either way.
- Edges. A proper kerb or a block border stops the edges crumbling and lifts the look for little money.
- Drainage. Tarmac is not porous, so the falls and where the water goes have to be designed.
- Ironwork. Manhole and gully covers raised to the new level add time.
Check for these before you sign
- Whether it is a rebuild or a resurface, in writing
- The sub-base depth and material
- Binder and surface course thickness
- The edging detail
- Where the water goes
- One whole price, not a “from” figure
More on how we build them on our tarmac driveways page.
Planning and dropped kerbs by council
A front driveway needs no planning permission if it is permeable or drains to your own lawn or border; more than 5m² of impermeable surface draining to the road does (Planning Portal guidance). A new or wider entrance also needs a dropped kerb, and who builds it depends on your council.
| Council | Towns we cover | Dropped kerb fees | Who builds the crossing |
|---|---|---|---|
| Milton Keynes City Council | Milton Keynes, Bletchley, Wolverton, Stony Stratford, Newport Pagnell, Olney, Woburn Sands, Bow Brickhill, Hanslope | £237 to apply, plus a £537 licence package | an NRSWA-qualified contractor under council licence (we can do it) |
| Central Bedfordshire Council | Aspley Guise, Cranfield, Woburn, Leighton Buzzard, Ampthill | £156 assessment fee, then the council’s quote | the council itself |
| Buckinghamshire Council | Winslow | £520.38 licence | a private NRSWA-qualified contractor you appoint |
| West Northamptonshire Council | Towcester | £330 licence and inspection fee | a contractor from the council’s approved list |
Fees from each council’s website, checked October 2026. See dropped kerbs for the full process in each town.
Things people ask about tarmac prices
How much does a tarmac driveway cost in Milton Keynes?
Is it cheaper to resurface tarmac than replace it?
Why is tarmac expensive on a small drive?
Do I need planning permission for a tarmac drive?
How much does it cost to resurface a tarmac driveway?
How much does a block border add to a tarmac driveway?
What affects the cost of a tarmac driveway?
Free design, free visit, free samples
We measure up, talk it through and send a written proposal with the build-up, the programme and one whole price. No pressure and no follow-up sales calls.