What a tarmac driveway costs

Honest guide prices for tarmac driveways in Milton Keynes — a full rebuild, a plane and re-top, and when tarmac is not the cheapest answer.

A new tarmac driveway in Milton Keynes typically costs £90–£130 per m² on a properly rebuilt base, so a two-car front drive of 40–50m² is usually £4,500–£6,500. Where the base is sound, a plane and re-top costs £45–£70 per m².

Full rebuild per m²
£90–£130
Two-car drive (40–50m²)
£4,500–£6,500
Plane and re-top
£45–£70 per m²
Sett or block border
+£40–£70 per linear metre

Updated October 2026. Guide prices, not a quote — your fixed price comes in writing after the free visit.

Guide prices

Tarmac driveway prices in 2026

WhatTypical price
New tarmac drive, full rebuild, per m²£90 – £130
Typical two-car front drive (40–50m²)£4,500 – £6,500
Plane and re-top on a sound base, per m²£45 – £70
Block or sett borderadd £40 – £70 per linear metre

Updated October 2026. Guide prices for 2026 across Milton Keynes and the surrounding towns. They are honest ranges, not a quote — your fixed price comes in writing after the free visit, and it does not move once agreed.

What moves the price

What changes the figure

  • Rebuild or resurface. The biggest single factor. A failed base has to come out and be rebuilt; a sound one can take a new surface.
  • Size. Tarmac gets cheaper per square metre as the area grows, because the crew and the minimum load cost the same either way.
  • Edges. A proper kerb or a block border stops the edges crumbling and lifts the look for little money.
  • Drainage. Tarmac is not porous, so the falls and where the water goes have to be designed.
  • Ironwork. Manhole and gully covers raised to the new level add time.
What should be in the quote

Check for these before you sign

  • Whether it is a rebuild or a resurface, in writing
  • The sub-base depth and material
  • Binder and surface course thickness
  • The edging detail
  • Where the water goes
  • One whole price, not a “from” figure

More on how we build them on our tarmac driveways page.

By council

Planning and dropped kerbs by council

A front driveway needs no planning permission if it is permeable or drains to your own lawn or border; more than 5m² of impermeable surface draining to the road does (Planning Portal guidance). A new or wider entrance also needs a dropped kerb, and who builds it depends on your council.

CouncilTowns we coverDropped kerb feesWho builds the crossing
Milton Keynes City CouncilMilton Keynes, Bletchley, Wolverton, Stony Stratford, Newport Pagnell, Olney, Woburn Sands, Bow Brickhill, Hanslope£237 to apply, plus a £537 licence packagean NRSWA-qualified contractor under council licence (we can do it)
Central Bedfordshire CouncilAspley Guise, Cranfield, Woburn, Leighton Buzzard, Ampthill£156 assessment fee, then the council’s quotethe council itself
Buckinghamshire CouncilWinslow£520.38 licencea private NRSWA-qualified contractor you appoint
West Northamptonshire CouncilTowcester£330 licence and inspection feea contractor from the council’s approved list

Fees from each council’s website, checked October 2026. See dropped kerbs for the full process in each town.

Questions

Things people ask about tarmac prices

How much does a tarmac driveway cost in Milton Keynes?
A new tarmac driveway on a properly rebuilt base typically costs £90 to £130 per square metre in Milton Keynes. A two-car front drive of around 40 to 50m² is usually £4,500 to £6,500. Larger areas come down in price per m².
Is it cheaper to resurface tarmac than replace it?
Yes, if the base underneath is sound. Planing off the top layer and laying a new wearing course costs far less than a full rebuild. If the drive has potholes that keep coming back or ruts where the cars sit, the base has failed and resurfacing will not last.
Why is tarmac expensive on a small drive?
Hot tarmac comes by the load and a surfacing crew costs the same for a morning whether the drive is 20m² or 60m². On drives under about 40m² block paving can work out cheaper, so we often price both.
Do I need planning permission for a tarmac drive?
Standard tarmac is not permeable, so over 5m² in a front garden the water must drain to a border, lawn or soakaway on your own land rather than the road. Designed that way, you generally do not need permission.
How much does it cost to resurface a tarmac driveway?
Resurfacing a tarmac driveway with a plane and re-top typically costs £45–£70 per m² in Milton Keynes, against £90–£130 per m² for a full rebuild. That price assumes the base is sound: the old surface is planed off, weak spots are repaired and a new wearing course goes down. If potholes keep returning or the drive has ruts where the cars sit, the base has failed and resurfacing will not last.
How much does a block border add to a tarmac driveway?
A block or sett border typically adds £40–£70 per linear metre to a tarmac driveway. It does two jobs: it gives the tarmac a solid edge to compact against so the sides do not crumble, and it lifts the look of a plain surface for relatively little money. An entrance apron or a band across the front of the drive is priced on the same basis.
What affects the cost of a tarmac driveway?
The biggest factor in tarmac driveway cost is whether the base is sound enough to resurface or has to be dug out and rebuilt. After that come the size of the drive, since tarmac gets cheaper per square metre as the area grows, the edging detail, how the water will be drained, and raising manhole and gully covers to the new level. A new drive on a rebuilt base typically runs £90–£130 per m².

Free design, free visit, free samples

We measure up, talk it through and send a written proposal with the build-up, the programme and one whole price. No pressure and no follow-up sales calls.

Call 01908 104408 Free design